FG considers truck diversion from First Niger Bridge over gridlock
The Federal Government is considering diverting heavy-duty trucks from the First Niger Bridge to the Second Niger Bridge to ease traffic congestion, according to Anambra State Federal Controller of Works, Timothy Emenike.
Speaking to PUNCH on Tuesday, November 3, Emenike said the ministry was examining measures to improve movement ahead of the festive travel season.
The proposal could include barriers at both entrances to restrict truck access. The report did not establish an implementation date, and IDNN has not independently confirmed that any restriction has taken effect.
Motorists question lane arrangement
PUNCH reported complaints from motorists that broken-down vehicles were obstructing passage through the bridge’s newly demarcated lanes, leaving road users stranded.
Emenike defended the arrangement, saying it had been tested. According to his account, a truck and a smaller vehicle could pass side by side within a lane, but two heavy-duty vehicles could not.
He identified diversion to the Second Niger Bridge as an option under consideration. Some drivers also called for towing vehicles to help clear breakdowns.
Bridge reopened after rehabilitation
The First Niger Bridge links Onitsha in Anambra State with Asaba in Delta State.
Channels Television reported that it reopened on October 15 following rehabilitation. Works Minister David Umahi said the intervention included structural repairs, resurfacing, lighting and surveillance equipment.
Median barriers and three designated turnaround points were also provided, according to the minister, to support traffic control and emergency response.
The material reviewed did not establish a start date or detailed operating arrangements for the proposed diversion.
