Metro News

Residents raise alarm over persistent refuse heap on Idimu–Ejigbo Road

Refuse heap persists on Idimu–Ejigbo Road as residents question waste response

Residents and business owners along Idimu–Ejigbo Road in Lagos are raising fresh concerns over a large refuse heap occupying part of the road median around the Dorcas and Silva Estate area.

A PUNCH reporter who visited the area observed waste stretching for about 150 metres along the median, with some refuse spilling onto parts of the road.

Residents say the heap has remained there for about six months.

That duration is based on resident accounts and has not been independently audited by IDNN.

Earlier evacuation did not clear entire stretch, residents say

Residents say an earlier round of waste evacuation cleared some sections around Idimu Bus Stop and OPC Junction but did not fully clear the Dorcas and Silva Estate stretch.

Some traders said that left the impression that the wider corridor had been cleared while refuse remained in their area.

That account has not yet been answered by the Lagos Waste Management Authority.

Odour and obstruction affect daily activity

People living and trading around the affected stretch say the refuse produces strong odours and makes movement more difficult for motorists and pedestrians.

Some business owners also say customers avoid staying near the heap.

Those are reported citizen experiences.

IDNN has not established a specific disease outbreak or quantified health impact linked to the refuse.

LAWMA response remains outstanding

The original report says calls and WhatsApp messages sent to LAWMA Managing Director Muyiwa Gbadegesin were unanswered before publication.

LAWMA has separately discussed broader waste-management challenges and reforms in Lagos.

But no specific response to the Dorcas and Silva Estate complaint has been located in the material reviewed by IDNN.

LAWMA’s right of reply therefore remains open.

Who is responsible for this stretch?

The central accountability questions are now specific.

Why was the Dorcas and Silva Estate stretch reportedly left behind after earlier evacuation?

Which agency or Private Sector Participation operator is responsible for the area?

And when will the remaining refuse be cleared and monitored to prevent another build-up?

For now, the verified publication position is limited:

A large refuse heap remains visible along part of the Idimu–Ejigbo Road median around Dorcas and Silva Estate.

Residents say it has persisted for about six months.

They also say earlier evacuation cleared other sections but did not fully clear this stretch.

LAWMA had not provided a specific response to the complaint in the latest material reviewed by IDNN.

Also See

Spain Send Warning To Portugal After Crushing Austria To Reach Last 16

Noble Onyeagoro

Super Eagles stay 26th in latest FIFA ranking as March results bring mixed points return

Noble Onyeagoro

APC Sweeps Kaduna Bye-Elections: Chikun/Kajuru, Zaria Kewaye, Basawa

IDNN

Nigeria’s overnight lending rate falls 100 bps

IDNN

Guinea-Bissau vs Nigeria: Super Eagles face early AFCON 2027 pressure test in Bissau

IDNN

Galatasaray Win Without Osimhen — But Okan Buruk Admits They Miss His Killer Edge

Noble Onyeagoro

This website uses cookies to improve User experience. Accept Learn More

Our Policies