Metro News

FG suspends Aseese bridge work after Lagos-Ibadan Expressway gridlock

The Federal Government has suspended work on a pedestrian bridge at Aseese along the Lagos-Ibadan Expressway after a traffic diversion linked to the project triggered severe congestion that stranded motorists and commuters for hours.

The Ogun State Traffic Compliance and Enforcement Agency said the construction and associated diversion had been suspended indefinitely pending further directives after significant traffic challenges along the corridor.

The pedestrian bridge installation was being carried out by the Federal Ministry of Works in collaboration with CBC Construction Company and had originally been scheduled to run from November 18 to November 22.

Under the temporary arrangement, Lagos-bound traffic was diverted around the Aseese construction zone before rejoining the expressway opposite Christ Embassy.

The diversion was intended to allow the pedestrian-bridge installation to proceed, but congestion spread across sections of the expressway, leaving some motorists facing journeys lasting several hours.

Reports from the corridor also described commuters abandoning vehicles to continue on foot, while transport fares rose sharply on some routes during the disruption.

TRACE said the experience had forced a review of the traffic-management arrangements surrounding the construction.

The acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, also confirmed that the bridge work was suspended because of the traffic situation.

The episode raises a wider accountability question: how traffic-management arrangements for a planned infrastructure project allowed disruption severe enough to force suspension.

Motorists quoted in local reporting called for better traffic planning, closer supervision and more effective alternative routes before work resumes.

At the time of this report, authorities had not announced when the pedestrian-bridge project would restart.

IDNN will track the revised traffic plan, any new construction timetable and whether authorities introduce measures to prevent a repeat of the disruption.

Independent Digital News Network

Also See

Atiku Coalition Accuses PDP Governors of Sabotaging Opposition,

IDNN

Confidence Abroad, Contraction at Home: The Split Reality of Nigeria’s 2025 Economy

IDNN

Protest Rocks NBA Conference Over Incarcerated Enugu LP Lawmaker (Bright Ngene)

IDNN

Israeli Strike Kills Al Jazeera Journalist Anas Al-Sharif in Gaza, Sparking Global Outrage

IDNN

Barcelona tighten grip on LaLiga title race after comeback win at Atletico Madrid

Noble Onyeagoro

Nigeria’s Refinery Crisis: Warri Shut, Port Harcourt Underperforms as Transparency Concerns Grow

IDNN

This website uses cookies to improve User experience. Accept Learn More

Our Policies